![background image](http://html1.mh-extra.com/html/lts/ptzh213x23/ptzh213x23_installation-manual_1945243007.webp)
Installation Manual of HD-TVI Speed Dome
6
Chapter 1
Preparation
Basic Requirement
All the electronic operation should be strictly compliance with the electrical safety
regulations, fire prevention regulations and other related regulations in your local region.
Check the package contents and make sure that the device in the package is in good
condition and all the assembly parts are included.
Checking Installing Environment
Be sure that there is enough space to install the speed dome and accessories.
Make sure that the wall is strong enough to withstand at least 8 times the weight of the
dome and the mount.
Preparing Cables
Choose the video cable according to the transmission distance, the minimum requirement for
the coaxial video cable are shown as follows:
75Ω impedance;
100% copper core conducting wire;
95% weaving copper shield;
RS485 communication cable, please refer to Appendix 2.
24V AC power cable, please refer to Appendix 3
Preparing Tools
Before installation, please prepare the tools needed, such as the expansion screws, electric
hammer, electric drill, wrench, screwdriver, electroprobe and network cable.
Original Packaging
When you unpack the dome, please keep the original package properly, in case of returning or
repairing the camera, you can pack the dome with the package.
The user should be responsible for any damage caused when transporting with unoriginal
package.