LP Morgan Installation Instructions | 3
LP Morgan Resi-Lift Manual
As Soon As Resi-Lift Arrives:
• Open carton and inspect for damage.
• Locate the following parts:
a.) The unit itself;
b.) Controls;
c.) Any optional equipment.
Planning
Based on screen location and projector specifications, determine proper
position for projector installation.
Confirm that there is adequate space for installation and operation. Minimum
clearance above ceiling level varies according to Resi-Lift plus height of
projector, optional projector mounting bracket, optional ceiling closure, and
optional environmental airspace housing.
Arrange to provide service access to the unit.