6 | LP Morgan Installation Instructions
LP Morgan Resi-Lift Manual
Generally, the video projector should be suspended from the bottom pan
according to
LP Morgan Skyhook instructions
(Included in the package).
If for any reason the hole placement must be changed, completely lower
Resi-Lift before attempting to drill new holes.
Control cables (maximum of four) should be laced through our Cable
Management System (back scissor only). This will ensure that cords do not
become tangled and damaged during Micro Projector Lift operation.
Unit and projection system should be operated, checked and adjusted as
necessary at this time (see below for limit adjustment procedures).
Installing projector
WARNINg:
Keep fingers & other objects away from ceiling closure & scissor
mechanisms when unit is operating. Serious injury or damage can result.