background image

6  | LP Morgan Installation Instructions

LP Morgan Resi-Lift Manual

Generally, the video projector should be suspended from the bottom pan 
according to 

LP Morgan Skyhook instructions

 (Included in the package).

If for any reason the hole placement must be changed, completely lower 
Resi-Lift before attempting to drill new holes.

Control cables (maximum of four) should be laced through our Cable 
Management System (back scissor only). This will ensure that cords do not 
become tangled and damaged during Micro Projector Lift operation.
Unit and projection system should be operated, checked and adjusted as 
necessary at this time (see below for limit adjustment procedures).

Installing projector

WARNINg:

  

Keep fingers & other objects away from ceiling closure & scissor 
mechanisms when unit is operating. Serious injury or damage can result.

Summary of Contents for Resi-Lift

Page 1: ...www lpmorgan com au LP Morgan Resi Lift manual...

Page 2: ...e allowed to rest on ceiling closure during operation Entire bottom of unit must be unobstructed to permit proper operation Unit must be installed level use a carpenter s level Unit operates on 220V A...

Page 3: ...Based on screen location and projector specifications determine proper position for projector installation Confirm that there is adequate space for installation and operation Minimum clearance above c...

Page 4: ...r field connections is located inside the unit on the left as seen from front or non scissored end Unit is shipped with internal wiring complete to the terminal strip Once the unit has been lowered tu...

Page 5: ...electrical connections before proceeding Cycle unit down and up several times to confirm satisfactory operation 220V Single Station Control CE Approved 3 position UP OFF DOWN switch permits operation...

Page 6: ...l new holes Control cables maximum of four should be laced through our Cable Management System back scissor only This will ensure that cords do not become tangled and damaged during Micro Projector Li...

Page 7: ...ill stop working until it has cooled to a safe temperature before it will start operating again Please refer to diagram below for these instructions Limit switches for the Resi Lift are preset at the...

Page 8: ...at the factory LP Morgan does not recommend changing this position using the limit switch The up position of the closure may be changed by changing the length of threaded rod see instructions for clo...

Page 9: ...o diagram below for these instructions Manual Installation Notes When the Resi Lift is in the closed position determine the spacing from the plate to the faceplate to allow for fitting of the projecto...

Page 10: ...Down Dashed wiring by electrician Control switch To 220v 50 Hz Blue Common Black Up N DN UP Neutral L1 Wiring diagrams Single Station Control CE Approved important If you are operating this unit with...

Page 11: ...ma Technologies Herma will not be responsible for any consequential damages during or following installation procedures Herma is not responsible for any freight costs relating to repair or replacement...

Page 12: ...chment instructions Allow for 15mm between cable and end of scissor when lift is fully down Use a 15mm diameter object such as a pin to measure See Note 8 See Note 11 Cable Caution Improper installati...

Page 13: ...on LP Morgan recommends a limit of four cables in addition to the pre wired power cord 220V lifts do not come with with pre wired power cord PLEASE NOTE The cable installer is responsible for ensuring...

Page 14: ...r September 2012 Version 1 2 Information in this document is subject to change without notice Herma Technologies All rights reserved This document is protected against unauthorised copying electronic...