
Installation
(for qualified installers only)
17
© Travis Industries
11/9/20 - 1478
PB 72 GSB2/GSR2 Aust.
4 Remove the (4) screws from each of the (2) header shields (keep the screws for reinstallation).
Turn each of the shields over endwise and secure them back into place using the screws you just
removed. The bent edge of the shields should be facing upward and toward the back of the
fireplace (see illustration below).
5 The (2) header standoffs are screwed down flat to front edge of the top of the shields. On each
standoff, remove the screw that is closest to the outside edge of the fireplace (keep screw for
reinstallation). Bend the legs at the perforations as shown below and attach the foot of the
standoff to the top of the fireplace using the screw removed earlier in this step.
NOTE
: Use the
forward hole for
standard position.
Attach the header shield to the
header standoff (both sides).
Bend the vertical standoff as
shown to the right (both sides).