Zero Clearance Box
Flush Wood Medium & Flush Wood Large Hybrid-Fyre™
Minimum Clearances & Hearth Requirements
Flush Wood Large Hybrid-Fyre™ Only
Section View
**Dimensions are subject to change at our discretion, please check with our office for further details
450
550
Mantel shelf
(Combustible)
250mm deep max
1250
50
34
Front wall lining must
be 6mm fibre cement sheet
Internal Stud Wall
Min 80mm clearance
from flue pipe to stud.
Applies to first flue length only.
25mm clearance applies thereafter
as per the Australian Standard.
Mantel fascia (combustible)
No thicker than 30mm
Plaster Wall
Minimum gap
50mm back of
ZC Box to wall
Finished Hearth
ZC Box
*Allowance must be made for any finished floor above existing concrete or timber floor.
SEE HEARTH REQUIREMENTS
SEE HEARTH REQUIREMENTS FOR FURTHER DETAIL
80
1030mm
Min*
(Timber Floor)
974mm
*
(Concrete Floor)
11