background image

Zero Clearance Box

Flush Wood Medium & Flush Wood Large Hybrid-Fyre™

Minimum Clearances & Hearth Requirements

Flush Wood Large Hybrid-Fyre™ Only

600

450

1045

50

Minimum gap

50mm back of

ZC Box to 

combustible wall

Minimum 80mm

between the flue outer 

casing and timber stud

Minimum gap 

50mm to 

combustible wall

HEARTH

ZC Box

Provision must be made for cross ventilation under zero clearance box on timber and concrete floor.

Eg. Vents in wall at floor level or through timber floor.

Suggested Minimum - 300Sq cm

Hearth

ZC Box

100

100

Mantel Fascia, no

thicker than 30mm

1250

 

1350

725

Mantel shelf - 250mm deep

Combustible 

Mantel Upright (no thicker than 80mm)

Combustible Mantel Upright (no thicker than 80mm)

Plan View

Elevation View

**Dimensions are subject to change at our discretion, please check with our office for further details

13

Summary of Contents for Flush Wood Large Hybrid-Fyre

Page 1: ...h Wood Medium Lopi Flush Wood Large Hybrid Fyre Zero Clearance Box Installation Manual Australia Only www lopi com au Dragon Wholesaling Pty Ltd 4 16 Lexington Drive Bella Vista NSW 2153 Australia Copyright 2018 ...

Page 2: ...ces included in this manual Section View Isometric View Elevation View Dimensions are subject to change at our discretion please check with our office for further details 2 30 945 550 945 695 695 725 34mm Ventilation Gap 34mm Ventilation Gap Igniter Installa on Uninstall the inner and outer access panels and remove the knockouts Feed wires and the air hose through the knockout holes in the access ...

Page 3: ... returns facing outwards Securing to the base is not required Step 5 Screw outer left outer right and outer rear panels into place ensuring the vent holes are to the bottom and return facing outwards Step 3 Screw inner top panel in place Step 6 Screw outer top panel into place with 1 x large return facing upwards at the front x 3 small returns facing downwards Note Right hand side panel has the ch...

Page 4: ...ulating cover where the fan power cable passes through the inner and outer panels NOTE 3 A triple skin flue must be installed from zero clearance box as per Australian Standards A 25mm clearance from the outer 10 casing to any combustible material must be maintained Please see heater owners manual for other clearances and more information Images for illustration purposes only some details may chan...

Page 5: ...p Wear gloves to prevent injury WARNING After the knock out is removed make sure any sharp edges or metal strips do not protrude from the knock out area Remove any sharp edges to prevent damage to the ignitor or its wiring a Use a wire cutter to remove the small strip of steel holding the knock out in place b Pry the knock out forward use a screwdriver or pliers c Bend the knock out repeatadly unt...

Page 6: ...made for cross ventilation under zero clearance box on timber and concrete floor Eg Vents in wall at floor level or through timber floor Suggested Minimum 300Sq cm Allowance must be made for any finished floor above existing concrete or timber floor SEE HEARTH REQUIREMENTS Measurements from top of concrete or timber floor Plan View Timber or Concrete Floor Elevation View Dimensions are subject to ...

Page 7: ...ion under zero clearance box on timber and concrete floor Eg Vents in wall at floor level or through timber floor Suggested Minimum 300Sq cm Allowance must be made for any finished floor above existing concrete or timber floor SEE HEARTH REQUIREMENTS Measurements from top of concrete or timber floor Plan View Timber or Concrete Floor Elevation View Dimensions are subject to change at our discretio...

Page 8: ...ebox Shown with Shadowbox Face ZC Box Hearth Section Timber Floor 34mm Hearth to be set at bottom of firebox Min 50mm Non Combustible 6mm FC Sheeting 450 550 50 Plaster Wall FC Sheet ZC Box 34 50 6 Finished Hearth Bottom of Flush Wood Face Backing Plate Timber Floor 6mm FC Sheeting 50mm Non Combustible Hearth Section View Isometric View 8 ...

Page 9: ...learance Box Both Models CONCRETE FLOORS Firebox Shown with Shadowbox Face ZC Box 34mm Hearth to be set at bottom of firebox Hearth Section Concrete Floor 450 550 50 Plaster Wall FC Sheet ZC Box 34 Finished Hearth Bottom of Flush Wood Face Backing Plate Concrete Floor Section View Isometric View 9 ...

Page 10: ...g must be 6mm fibre cement sheet Internal Stud Wall Min 80mm clearance from flue pipe to stud Applies to first flue length only 25mm clearance applies thereafter as per the Australian Standard Mantel fascia combustible No thicker than 30mm Plaster Wall Minimum gap 50mm back of ZC Box to wall Finished Hearth ZC Box 930mm Min Timber Floor 874mm Concrete Floor Allowance must be made for any finished ...

Page 11: ...lining must be 6mm fibre cement sheet Internal Stud Wall Min 80mm clearance from flue pipe to stud Applies to first flue length only 25mm clearance applies thereafter as per the Australian Standard Mantel fascia combustible No thicker than 30mm Plaster Wall Minimum gap 50mm back of ZC Box to wall Finished Hearth ZC Box Allowance must be made for any finished floor above existing concrete or timber...

Page 12: ...Box Provision must be made for cross ventilation under zero clearance box on timber and concrete floor Eg Vents in wall at floor level or through timber floor Suggested Minimum 300Sq cm Hearth ZC Box 100 100 Mantel Fascia no thicker than 30mm 1210 1300 725 Mantel shelf 250mm deep Combustible Mantel Upright no thicker than 80mm Combustible Mantel Upright no thicker than 80mm Plan View Elevation Vie...

Page 13: ...H ZC Box Provision must be made for cross ventilation under zero clearance box on timber and concrete floor Eg Vents in wall at floor level or through timber floor Suggested Minimum 300Sq cm Hearth ZC Box 100 100 Mantel Fascia no thicker than 30mm 1250 1350 725 Mantel shelf 250mm deep Combustible Mantel Upright no thicker than 80mm Combustible Mantel Upright no thicker than 80mm Plan View Elevatio...

Reviews: