background image

 

Installation Steps 

 

Hardware Installation 

1)

 

Connect the device to a DC 12v power source, as shown below. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2)

 

Press and hold the terminal block to open the connector and connect the output cable to 

the corresponding terminal. Release to lock the cable in place. Note that the output load 

capacity is < 20mA. 

 

 

Ground 

 

DC 12V 

Output 2 

Output 1 

Summary of Contents for Smart Translator WL-ZWWWDPW-0101-01

Page 1: ...2019 Logika Limited Smart Translator WL ZWWWDPW 0101 01 Product Manual Version 1 0...

Page 2: ...nstallation and use Before use the product must be properly installed as described in this manual by a qualified technician The product should be used with the supplied accessories Do not disassemble...

Page 3: ...2 Device Layout Terminal Blocks System Indicator Multi Function Button Power DC 12V Output 1 Output 2 Ground Wire...

Page 4: ...time setting and linkage control to other smart devices Specifications Communication Protocol IEEE 802 15 4 Communication Distance 100m Port Output Configuration Double switched relay output signal W...

Page 5: ...o a DC 12v power source as shown below 2 Press and hold the terminal block to open the connector and connect the output cable to the corresponding terminal Release to lock the cable in place Note that...

Page 6: ...he Logika Smart Mobile App user guide which will take you through the process of adding smart devices to the system Refer to the information below to locate the device in the Device Add screen Once se...

Page 7: ...app and follow the instructions below Join the Zigbee Network Press the Multi Function Button 4 times in quick succession The System Indicator light will start flashing signifying it s searching for t...

Page 8: ...not removed from the test network at the factory Perform the Quit the Zigbee Network procedure mentioned in Device Functions section to clear this setting You should now be free to add the device to...

Reviews: