![LOGAIRE FIRES MAUI Installation And Operating Instructions Manual Download Page 18](http://html.mh-extra.com/html/logaire-fires/maui/maui_installation-and-operating-instructions-manual_1934377018.webp)
P:\Public\Spec Sheets\MAUI Gas Fire Indtructions.pdf
18
INSTALLATION
VENTING REQUIREMENTS
Minimum vertical runs shall be no less than 2.4 metres.
Changes of direction from the vertical should be avoided where possible.
NOTE:
Vertical run to be at maximum possible distance before any
change in direction.
Where change of direction is unavoidable refer to NZS 5261-1996 Standard / AG601
1995 Australian gas association standard.
Where gradient of lateral (horizontal) runs are required LOGAIRE recommends a
minimum angle of 45% with a minimum run of 600 mm height of vertical flue before
gradient, provided a 1.5 meter vertical run is fitted after any off-set,
Refer to diagram 7.
DIAGRAM 7
Any deviation from minimum and maximum recommended dimensions may effect
performance of the fire.