17
FIGURE 8.3
CUTTING ITEM 5 TO LENGTH
To install the flue connection to the EKB45CE – EKB60CE boilers the following procedure should be followed:
1.
Insert the exhaust transition (Item 7 in
Figure 8.2
) into the exhaust port on the boiler.
2.
Insert the flue temperature sensor (supplied with the boiler) into the location hole on the exhaust transition.
NOTE: IF THE FLUE TEMPERATURE SENSOR IS NOT FITTED, THE FLUE GAS MAY EXCEED THE
MAXIMUM TEMPERATURE RATING OF THE FLUE AND CAN LEAD TO SEVERE PERSONAL INJURY, DEATH
OR SUBSTANTIAL PROPERTY DAMAGE.
3.
Insert the air intake transition (Item 5 in
Figure 8.2
) into the intake connection reducer (Item 6) and tighten
the worm drive clip.
4.
To the bottom (exhaust) connection of the concentric adaptor (Item 2 in
Figure 8.2
) fit the 80mm dia. x
500mm length then fit one 90° elbow to the 500mm length.
5.
To the side (intake) connection of the concentric adaptor, fit the remaining 90
elbows.
6.
Fit the exhaust section of the assembly to the boiler, ensuring the concentric adaptor is vertical, and
measure the distance between the centre of the air intake transition and the 90
elbow. (See
Figure 8.3
)
7.
Remove the 80mm dia. x 500mm length and cut the measured distance from the plain end. (See
Figure
8.3
)
8.
Reassemble and fit to the boiler.
9.
Fit the flue gas test point (Item 1 in
Figure 8.2
) and clamp using its locking band.
"X"
"X"