Installation
30
Instruction manual CHA
3
is
Gas control for CHA 700
3.11.1
Preparations
1. Isolate the appliance from the power supply
(10.3 "Isolating the appliance
from the mains")
.
2. There are two test nipples on the gas control. Test nipple (6) is used to check
the supply pressure. The other test nipple on the gas control is not used. The
manifold test nipple (8) is used to measure the burner pressure.
Sealing screws are located inside the test nipples. Loosen both sealing
screws by a few turns. Do not completely loosen them; they can be difficult
to re-tighten.
3. Connect a pressure gauge to the manifold test nipple (8).
4. Open the gas supply and bleed the air from the mains gas supply via test
nipple (6).
5. Connect a pressure gauge to the manifold test nipple (6) when gas starts to
flow from this nipple.
6. Switch on the power to the appliance using the isolator on the appliance.
7. Set the control thermostat to the maximum temperature and start the
appliance running by setting the ON/OFF switch to position I.
8. The heating cycle will start, and after a short time the burner tray will ignite.
9. After the burner tray has ignited, wait approximately 1 minute before reading
the dynamic pressures.
Legend
Unused numbers are not applicable
1.
burner pressure regulator
2.
burner pressure regulator
cap
3.
burner pressure regulator
adjusting screw
6.
supply pressure nipple
7.
gas control
8.
manifold test nipple
9.
high-low control
1
9
6
7
8
2
3
IMD-0129 R1
Summary of Contents for CHA 100 CE
Page 4: ...4 Instruction manual CHA gis...
Page 10: ...Introduction 10 Instruction manual CHA 1 gis...
Page 32: ...Installation 32 Instruction manual CHA 3 is...
Page 40: ...Conversion to a different gas category 40 Instruction manual CHA 4 is...
Page 50: ...Starting the water heater 50 Instruction manual CHA 9 gis...
Page 52: ...Shutting down 52 Instruction manual CHA 10 gis...
Page 70: ...Electrical diagram 70 Instruction manual CHA 14 is...
Page 72: ...Declaration of Conformity 72 Instruction manual CHA 15 is...