7
Tank Unit
Nozzle Unit
Chute Hose
Fix
Storage Case
of Shaft
Shaft
Need Enough
Space
3.
PREPARATION BEFORE USE
The tool must be prepared by the following procedure:
(1) Set up a correct nosepiece and a correct guide pipe according to the size of rivet to be used.
Default setup is 3.2 mm-diameter nosepiece and yellow guide
pipe.
(2) Fix a tank unit and or a chute hose (optional
parts). Following is the procedure to use a
chute hose.
•
Insert the end of chute hose to the nozzle
unit fully.
•
Fix the other end of the chute hose to the
storage case securely so that it does not
loose during operation. There must be
enough space in the end of the chute hose.
Lack of space or obstacles in the end of the
chute hose may prevent a shaft of cut rivet
from being discharged or cause
degradation in discharge power.
Nosepiece
Die Stamp
2.4
3.2
4.0
4.8
Guide Pipe
A(Yellow)
B(White)
Die Stamp for Size
Classify by color
A : Yellow
B : White
Rivet Diameter
Flange
Shaft
Nosepiece
Guide Pipe
Rivet