
Daily Start-Up
Removing Gas Flushing Nozzles
l
Remove the Allen screw with a Allen key 5 mm
l
Take off gas flushing nozzles (41)
l
Put cover pieces (21) in place and secure with Allen
screws
ATTENTION
Check that gaskets are in order replace if
necessary.
Fig. 23
10.6 Intervention in the Packaging Cycle
Note
The interventions described affect only the cycle just
finished and have no effect on the values you have
programmed in
these remain unchanged in the
storage.
The following interventions during packaging can
be undertaken with keys UP (6) and DOWN (7)
-when evacuating
As long as the UP key (6) is held down the
action of the vacuum pump continues
till the key is released.
With DOWN key (7) the pump is
immediately stopped and the cycle ended.
-when gas flushing
While the UP key (6) is held down the
gassing remains switched on, even if the
vacuum falls below the set value the gas
content increases.
W ith DOWN key
gassing is ended
and the cycle
-when partially releasing vacuum
While the UP key (6) is pressed the partial
release
o f v a c u u m
remains
switched
on, even if the vacuum falls below the set
value.
With DOWN key (7) immediate halt to partial
release of vacuum. Cycle continues
to the
end.
in the packaging cycle
Operating Instructions Vacuum Packaging Machine Type
control goes back into the base setting.
21