Work before first Start-up
8 Work before first Start-Up
Please Note
Before the arrival of the
Customer Service the
customer should carry out the following work:
l
Electrical Connection (Heading 8.1)
l
Check oil level, adding oil if necessary (Heading 8.2)
l
Fit Inert Gas Cylinder (Heading 8.3)
l
Clean Machine (Heading 8.4)
8.1 Electrical Connection
The electrical connections must be
done by a qualified electrician in
accordance with the currently valid
local regulations.
The machine is delivered ready for use with a 4 core
(3 E) connecting cables, but without plug.
l
Check that the local voltage frequency and fuse
protection agree with those on the typeplate and in
the Technical Data (Heading 4). Do not connect up
machine if they differ.
l
Connect the electrical cable to a CEE ring-main
ATTENTION
Commissioning of the machine should only be
carried out by the
Customer Service.
8.2 Compressed Air Connection
l
Remove back panel (22, fig.5)
l
Push the compressed air hose (29) (interior diam 6 mm)
Fig.10
Operating Instructions Vacuum Packaging Machine
Type
on the nozzle of the compressed air unit and secure it
with a hose clip.
NOTE
For machines without an inert gas fitting this is not
essential but is recommended when folds are being
sealed.
8.3 Checking Oil in Vacuum-Pump and
Auxiliary Pump/or fill up with Oil
CHECK
The oil level must be visible in the upper sight glass
Oils recommended
Vacuum pump: Check recommended oil plate on the
machine back cover.
Oil quantity about: 6 litres
Auxiliary pump: Check recommended oil plate on the
auxiliary pump. Mobil D.T.E Medium
preferred.
Oil quantity about:
litres
35 37
36
57 58 56
Fig. 11
l
If for reasons of transport the machine has been
delivered without oil, pour about 6 litre of lubricating
oil into the vacuum pump (35) through the filler
opening (37). Check oil level in sight glass (36).
l
Add about 0.5 litre lubricating oil to the auxiliary
pump (56) at the filler opening (58). -Check oil level
at oil sight glass (57).
l
Replace back panel (22) securely.