ECP-105T [EUM-C]
7
2-6 Dry Contact Inputs
NOTE: if the panel is in SC (OFF), the dry contact is acted; if the panel recalls any
SC (not OFF), the dry contact is not acted;
In EDX:
The SC 5 will be recalled by actuating input 1; SC OFF will be recalled by
disconnecting input 1 for 30s;
The
SC
6 will be recalled by actuating input 2;
SC OFF will be recalled by
disconnecting input 2 for 30s.
In NEX:
1. Set ECP-105T single zone, the zone is 01
STEP1
:
Send command of SERVICE18 by actuating input 1; DP-E700
executes the command of SERVICE18:
80 01 55 01 00 12 00 00 05
STEP2
:
Send command of SERVICE19 by disconnecting input 1; DP-E700
executes the command of SERVICE19:
80 01 55 01 00 13 00 00 05
STEP3
:
Send command of SERVICE20 by actuating input 2; DP-E700
executes the command of SERVICE20:
80 01 55 01 00 14 00 00 05
STEP4
:
Send command of SERVICE21 by disconnecting input 2; DP-E700
executes the command of SERVICE21: