
6
lci1.com
574-537-8900
Rev: 04.03.20
Solera
®
Universal Hardware
Power Awning to
Solera 12V Power Awning
(For Aftermarket Application)
CCD-0001282
Fig.2
3.
Remove all fasteners from the lower and middle sections
of both the drive side and idler side mount arms
(Fig.2)
.
NOTE:
Do
NOT
remove the upper fasteners of the mount
arms at this time.
4.
Pull the wiring out of the sidewall and disconnect all
leads from the unit wires.
5.
Connect motor leads
(Fig.3A)
to a cordless battery
(Fig.3B)
and retract the awning so that approximately 12” of
awning fabric remains extended.
Fig.3
A
B
6.
For both the drive side and idler side support arm
assemblies, secure the outer arm
(Fig.4B)
to the mount
arm
(Fig.4A)
using the nylon ties provided
(Fig.4C)
.
7.
On the drive side support arm assembly and with an
additional assistant holding the roll tube
(Fig.5A)
, remove
the screws securing the end cap
(Fig.5B)
to the roll tube.
IF NOT PROPERLY SECURED, THE SUPPORT ARMS
CAN KICK OUT DUE TO PRESSURE FROM THE GAS
STRUT, WHICH MAY RESULT IN SERIOUS INJURY OR
PROPERTY DAMAGE.
A
B
C
Fig.4
A
B
Fig.5