8
24V
+B
-A
SH
GND
GND
GND
AO1
AO2
AIN
MO1
MO2
1 2 3 4 5 6 7 8 9 10 11 12
SCL
SDA
GND
3V3
16
15
14
13
24V AC/DC
{
G+
G-
Modbus
{
+B
-A
Analog
signals
{
AO1
AO2
AIN
Lindab reserves the right to make changes without prior notice
2020-08-05
Lindab reserves the right to make changes without prior notice
2020-08-05
UltraLink Controller
FTCU
lindab | we simplify construction
Option B: Circuit board screw terminals
Connections are made in the terminal board which can be accessed when the lid of the display unit is removed. In the
back of the lid there is a picture with a list of the terminals.
1.
24V
, power supply (AC G, DC +) *
2.
GND
, power supply (AC G0, DC -) *
3.
+B
, connection for Modbus via RS485
4.
-A
, connection for Modbus via RS485
5.
SH
, shield
6.
GND
, ground (system neutral)
7.
AO1
, analog output
8.
AO2
, analog output
9.
AIN
, analog input
10.
MO1
, connection for motor
11.
MO2
, connection for motor
12.
GND
, ground (system neutral)
13.
SCL
, not used
14.
SDA
, not used
15.
GND
, ground (system neutral)
16.
3V3
, not used (in case of biasing)
*) When using AC terminal 1 (G) must have system potential and terminal 2 (G0) must be system neutral.
General information (option A and B)
Function
Cable type
24 V Supply
2-wire, thickness depending on length and load, max. 1,5 mm²
RS485 Modbus communication
2-wire shielded twisted pair, min. 0,1 mm² (LIYCY cable)
Using other cables for Modbus signals may result in communication problems.
Analog connection
When connecting the FTCU using analog
signals, it is important to connect the
analog out signals on the FTCU (AO1,
AO2) to the analog in terminals on the
RTU and the analog in signal (AIN) is
connected to the analog out terminal on
the RTU. Also make sure to connect the
cables to the same analog ground.
Option A: Connect to premounted cable
Connect the premounted cable in a junction box near the FTCU. Con-
nect power and signal cables in the junction box according to the color
scheme on the lable on the premounted cable, see picture to the right.
When connecting Modbus signal wires, the length of the premounted
cable needs to be as short as possible, since these have a negative
effect on signal quality.
In this case, place junction box as close to the FTCU as possible, then
cut the premounted where it is as short as possible for installation.
Connection of
UltraLink
Note!
All cables that are
not connected must be
insulated.
24V
Red
GND
White
+B
Yellow
-A
Brown
GND
Grey
AO1
Green
AO2
Blue
AIN
Pink