Installation instructions
Plexus
We reserve the right to make changes
2019-06-20
lindab | we simplify construction
2 Control of delivery
2.1 Before you start
Read through the entire installation instruction before
commencing installation in order to determine which
parts that needs to be performed and in what order to
be done.
Lindab is a supplier of complete water products, but we
offer also a wide range of accessories which suit perfectly
to our water products simplifying your installation work,
e.g. different type of hangers, Tektite-couplings, closing
valves, thermostatic valves and actuators, flexible
hoses, customized regulation components, customized
cabeling and more. See also the separate document
“Accessories”.
Lindab will also provide you with a full ventilation system,
with a wide range of Lindab Safe components. See also
“Air Duct Systems”.
2.2 Safe operation
Beware of sharp edges, especially of the coils. Always
wear thin gloves and protective clothing.
All existing safety regulations must be observed
when working with Lindab water products. Check the
weights of the beams or the panels with the installation
instruction before carrying.
2.3 Receipt of goods
Start by checking that the delivery is complete
according to the order and that everything listed on the
consignment note has been delivered. Then carry out a
review of the products and make sure that nothing was
damaged during transportation. If you discover damage
that has occurred during delivery, it must be notified
immediately.
Lindab is not responsible for costs associated with the
replacement of products that have been installed in any
way other than shown in these installation instructions.
1.2 Symbols
Heavy Load - 2 man job -
It is recommended to use
a “lift” for mounting.
Hand-pull
Hot water
Cold water
2.4 Unloading of goods
The beams and panels are normally delivered packed
on wooden pallets. Lift the pallets carefully with a fork
lift and place them on a dry and plain surface/ground. If
the beams are delivered in single boxes, wooden blocks
should be placed on the ground at one-metre intervals
(or a pallet), before the boxes are been placed to store.
Lindabs water products must be stored on a plane
surface in a dry and well ventilated place, preferably
indoors. If they have to be stored outdoors, protect them
with a waterproof cover and store them protected from
rain beneath a roof or other until they are fitted.
2.5 Handling / Carrying
The beam or panel must be handled with care,
ensuring that it will not be scratched or bended during
transportation, preparation and installation.
Always carry the beams or panels piecewise into the
building. Keep the product in the package as long as
you can.
Never use piping connections or edges to lift them,
neither when you unpack them nor when you carry them
towards the construction site.
Do not place the product directly on the floor. Use the
protective corners from package or other clean means
from package to place the product before installation.
Be careful if you must carry a long panel horizontally;
if the panels are bended lengthwise, the profiles may
be deformed and the piping could be loosen from the
panel. When opening the box with a knife, be careful not
to damage the product.
Each beam is equipped with protective film to avoid any
damage during transportation and handling on building
site. The film needs to be removed before commissioning
the products.