![Lincoln Electric Modular Fume Hood Operator'S Manual Download Page 21](http://html1.mh-extra.com/html/lincoln-electric/modular-fume-hood/modular-fume-hood_operators-manual_1918055021.webp)
A-13
INSTALLATION
MODULAR FUME HOOD
™
Standing:
1. Place the hood on its final position. See Figure A.23.
2. Fasten the floor mounting plates to the floor. See Figure A.23.
FIGURE – A.23
3. It is strongly recommended to place column guards around the
legs.
4. Connect the connection flange to an external
extraction/filtration system. For recommended extraction
capacity and pressure drop data refer to Technical
Specifications.
•
During installation, prevent any ductwork from leaning
on the roof panels.
•
The profiles, on the other hand, are strong
enough to support the duct.
INSTALLATION
Strip brackets and welding strips
1. Cut the welding strips to the desired length.
2. Fasten the welding strips in the brackets. See
Figure A.24.
3. Attach the brackets to the main frame profiles. See
Figure A.25.
ATTENTION
XXI
FIGURE – A.24
7 mm
FIGURE – A.25