26
SECTION 5 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
5.3
5.4
9/16”
(≈14 mm)
ABA
(x1)
ABB
(x1)
6 1/2" (≈16.5 cm)
ABA
ABB
AMN
AKI
AQE
AKF
• Position the
Trigger (AMN)
inside of the
Handle (AKI)
as shown, and secure the Trigger to the Handle with the
hardware shown.
• Insert the
Release Pin (AQE)
through the
Gas Spring (AKF)
.
• Tighten the Centerlock Nut (ABB) until
it is fl ush with the end of the Bolt.
!
(x2)