29
X
SECTION 4 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
4.6
• Attach both
Upper Extension Arms (BGO)
to the
Backboard (AJI)
with the hardware shown.
3/4”
(≈19 mm)
ANK
(x2)
AOR
(x2)
ANU
(x2)
• Tighten the Nuts (ADM) until they are fl ush
with the end of the Bolts.
!
BGO
BGO
(2)
ADM
ABN
AOR
ANK
ANU
BGO
ABN
(x2)
ADM
ABN
AOR
ANK
ANU
BGO
ADM
(x2)