43
TOOLS AND HARDWARE REQUIRED
X
SECTION 6 (CONTINUED)
(x1)
6.7
• Pull out the end links of the
Chains (CNC)
so they are away from the sides of the base. Mark the location of the last
links in the chain and use a hammer drill to drill a hole 1/2 inch (13 mm) in diameter and 1 1/2 inches (39 mm)
deep in the concrete in each spot. Place the
Concrete Anchors (AQQ)
in the drilled holes and use a 5/16” hex bolt and
a hammer to tap down the anchor tab located inside each anchor. Tap with force at least fi ve or six times until the
sides of the anchor begin to fl are. Slide a
Hex Bolt (CHQ)
through a
Washer (AAF)
and through the end link of the chain.
Secure the bolts into the concrete anchors.
Repeat for the other side.
AAF
AQQ
• Do not attempt to use the portable unit without fi rst fi lling the base with
weight and securing the concrete anchors. The system may fall over without
being secured to the ground and could cause serious personal injuries.
• To prevent the base from being punctured,
install the concrete anchors in a way that
will not permit them to come in contact
with the base. The hardware used with
the concrete anchor could puncture the
base, resulting in leakage, which could
cause the system to tip over, potentially
resulting in serious personal injuries.
!
!
CHQ
AAF
(x2)
CHQ
(x2)
AQQ
(x2)
AQQ
9/16”
(≈15 mm)
(x1)