53
Step 3
Route the Low Cable (87) under a Pulley (19).
Attach the Pulley (19) to the Main Base Tube (1) with one M10x45 Hexagon Head Bolt (74),
one M10 Nylon Lock Nut (83), and two Ø10 Flat Washers (65). Tighten bolt and nylon lock
nut with two 14-17 Double Open End Wrenches provided.
PLEASE REFER TO THE “LOW CABLE LOOP DIAGRAM” SECTION ON
PAGE 49.
Hardware:
(19) Pulley
1 PC
(74) Hexagon Head Bolt
M10x45
1 PC
(65) Flat Washer Ø10
2 PCS
(83) Nylon Lock Nut M10
1 PC
17
14
17
14