SM60 Unpacking & Assembly Instructions
13
CROSSOVER CABLE ROUTING
Once you’ve removed the pulleys as described previously, route the two crossover cables as
shown in Figure 16.
Figure 16. Crossover cable routing.
Bolt the cable to the weight stacks as shown in Figure 17. Thread the 7/8” nut up on the
cable bolt as shown at left. Screw the bolt down into the weight stack as shown at right.
Tighten the bolt with a 7/8” combination wrench.