SM60 Unpacking & Assembly Instructions
5
Figure 3. Set the weight stack cubes.
2.
Bolt on the teardrop pulleys above the benches
(see Figure 4) on both cubes
using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross
members and the adjustable pulley tops to the top beams). Include the 3/8” flat
washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt
configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt
holes.