66 | LIMITS / PLACEMENT
LIMITS / PLACEMENT | 67
Piping Limitations and Placement Considerations
MUL
TI V W
ater IV Source Unit Engineering Manual
© LG Electronics Canada, Inc., North York, ON Canada. All rights reserved. “LG” is a registered trademark of LG Corp.
.
© LG Electronics Canada, Inc., North York, ON Canada. All rights reserved. “LG” is a registered trademark of LG Corp.
WSU
Capacity
(ton)
Pipe diameter when equivalent pipe length
from WSU to farthest IDU is <295 ft.
Pipe diameter when equivalent pipe length
from WSU to farthest IDU is >295 ft.
Liquid Pipe
(inches OD)
Low Pressure Vapor
Pipe (inches OD)
High Pressure Vapor
Pipe (inches OD)
Liquid Pipe
(inches OD)
Low Pressure Vapor
Pipe (inches OD)
High Pressure Vapor
Pipe (inches OD)
6
3/8
3/4
5/8
1/2
3/4
5/8
8
3/8
7/8
3/4
1/2
7/8
3/4
10
1/2
1-1/8
3/4
5/8
1-1/8
3/4
12
1/2
1-1/8
7/8
5/8
1-1/8
7/8
16
5/8
1-1/8
1-1/8
3/4
1-1/8
1-1/8
20
5/8
1-3/8
1-1/8
3/4
1-3/8
1-1/8
24
3/4
1-3/8
1-1/8
7/8
1-3/8
1-1/8
28
3/4
1-3/8
1-1/8
7/8
1-3/8
1-1/8
36
3/4
1-5/8
1-1/8
7/8
1-5/8
1-1/8
40
3/4
1-5/8
1-1/8
7/8
1-5/8
1-1/8
48
3/4
1-5/8
1-1/8
7/8
1-5/8
1-1/8
Table 36: Main Pipe (A) Diameter from Water Source Unit to First Y-branch.
PIPING LIMITATIONS
For Systems Designed for Heat Recovery Configuration
Following pages present Multi V Water V piping limitations and are for illustrative purposes only. Designers MUST use LATS when designing LG VRF
systems.
Figure 29: Heat Recovery Triple-Frame Connections.
Triple-Frame Heat Recovery Water Source Unit Connections
• A1, A2, and A3 diameters match the water source unit connection diameters. Main pipe C diameters are sized by LATS.
• For single and dual-frame systems, the pipe size is the same size as the frame connections.
• Always reference the LATS Multi V software report.
• Larger-capacity water source units must be the master in a multi-frame system.
• Master water source unit capacity must be greater than or equal to the slave1 water source unit capacity, and, where applicable, slave1
water source unit capacity must be greater than or equal to the slave2 water source unit capacity.
• Connection piping from branch to branch cannot exceed the main pipe diameter (A) used by the water source unit.
• Install the header branches so that the pipe distances between the between the connected indoor units are minimized. Large differences in
pipe distances can cause indoor unit performances to fluctuate.
•
Y-branches and other header branches cannot be installed downstream of the initial header branch.
PIPING LIMITATIONS
For Systems Designed for Heat Recovery Configuration
Following pages present Multi V Water V piping limitations and are for illustrative purposes only. Designers MUST use LATS when designing LG VRF
systems.
Slave 2
Slave 1
Master
To Heat Recovery Units
A1
A2
ARCNB21 Kit
Three (3) Y-branches
for liquid pipe, high-pressure vapor
pipe, and low-pressure vapor pipe
B
A3
C – Main Pipe Sized by LATS
Liquid Pipe
Low Pressure Vapor
ARCNB21 and ARCNB31
Multi-Frame WSU
Heat Recovery Systems
Y-Branch Connector Kits
Liquid Pipe
Low Pressure
Vapor Pipe
Represents THREE* pipes
ARCNB31 Kit
Three (3) Y-branches
for liquid pipe, high-pressure vapor
pipe, and low-pressure vapor pipe
*Liquid
Low Pressure Vapor
High Pressure Vapor
High Pressure Vapor
Liquid Pipe
Low Pressure Vapor
High Pressure Vapor
Liquid Pipe
Low Pressure Vapor
High Pressure Vapor
High Pressure
Vapor Pipe
LIMITS / PLACEMENT | 73
Piping Limitations and Placement Considerations
Due to our policy of continuous product innovation, some specifications may change without notification.
©
LG Electronics Canada, Inc., North York, ON. All rights reserved. “LG” is a registered trademark of LG Corp.
Downstream IDU total capacity
(Btu/h)
Liquid pipe (inches OD)
Vapor pipe (inches OD)
Low pressure
High pressure
Table 7: Refrigerant Pipe (B) Diameters between Y-branches and Y-branches / Heat Recovery Unit / Headers.
Table 8: Indoor Unit Connecting Pipe from Branch (C).
Indoor Unit Capacity
1
Liquid pipe (inches OD)
Vapor pipe (inches OD)
≤19,100
1/4Ø
1/2Ø
≤54,600
3/8Ø
5/8Ø
≤76,400
3/8Ø
3/4Ø
≤95,900
3/8Ø
7/8Ø
1
9,600-24,200 Btu/h 4-way 3 feet x 3 feet Cassette and 15,400-24,200 Btu/h High Static Ducted IDUs have 3/8Ø (liquid) and 5/8Ø (vapor).
PIPING LIMITATIONS
For Systems Designed for Heat Recovery Operation
Following pages present Multi V 5 piping limitations and are for illustrative purposes only. Designers MUST use LATS when designing LG VRF systems.
Conditional Applications
Conditional applications are computed in LATS. See below for an explanation of when pipes are upsized.
If the equivalent length between the first Y-branch to the farthest indoor unit is >131 feet (maximum 295 feet):
• Pipe segment diameters between the first branch and the last branch must be sized up by one. This applies to both liquid and low / high
vapor pipes. If the next size up is not available, or if the pipe segment diameters are the same as main pipe (A) diameters, sizing up is not
possible.
• While calculating total refrigerant piping length, pipe (B) segment lengths between the first Y-branch and second Y-branch, and between the
second Y-branch and the heat recovery unit must be calculated by two.
• Length of pipe (C) from each indoor unit to the closest Y-branch, header, or heat recovery unit ≤49 feet.
• [Length of pipe from outdoor unit to farthest indoor unit (A+B+C)] - [Length of pipe from outdoor unit to closest indoor unit (A+B+C)] ≤131
feet.
≤19,100
1/4Ø
1/2Ø
3/8Ø
≤54,600
3/8Ø
5/8Ø
1/2Ø
≤76,400
3/8Ø
3/4Ø
5/8Ø
≤114,700
3/8Ø
7/8Ø
3/4Ø
≤172,000
1/2Ø
1-1/8Ø
7/8Ø
≤229,300
5/8Ø
1-1/8Ø
7/8Ø
≤248,400
5/8Ø
1-3/8Ø
1-1/8Ø
≤344,000
3/4Ø
1-3/8Ø
1-1/8Ø
≤592,500
3/4Ø
1-5/8Ø
1-3/8Ø