![LG Multi V ARNU053TRD4 Engineering Manual Download Page 129](http://html.mh-extra.com/html/lg/multi-v-arnu053trd4/multi-v-arnu053trd4_engineering-manual_211968129.webp)
GUIDELINES | 129
Application Guidelines
'XHWRRXUSROLF\RIFRQWLQXRXVSURGXFWLQQRYDWLRQVRPHVSHFL¿FDWLRQVPD\FKDQJHZLWKRXWQRWL¿FDWLRQ
©
/*(OHFWURQLFV86$,QF(QJOHZRRG&OLIIV1-$OOULJKWVUHVHUYHG³/*´LVDUHJLVWHUHGWUDGHPDUNRI/*&RUS
General Mounting
The ceiling must be strong and solid enough to protect the unit from vibration. All ceiling-cassette indoor units include a pattern to help deter-
mine the size necessary for the opening in the false ceiling (paper pattern dimensions match those for the ceiling opening dimensions), and
where the hanging bolts and refrigerant / drain piping are placed.
TM,TN,TP Frame
34-7/16 (Ceiling opening)
30-15/16
(Hanging bolt)
26-15/16 (Hanging bolt)
26-7/16
34-7/16 (Ceiling opening)
33-1/16
Unit size
33-1/16 Unit size
TQ,TR Frame
20-3/8~26 (Ceiling opening)
23
18-1/8
23
20-3/8~26 (Ceiling opening)
20-9/16
22-7/16
22-7/16
12-9/16
(Hanging bolt)
(Hanging bolt)
Unit size
Unit size
Unit: Inch
Unit: Inch
Figure 98: Ceiling Opening / Hanging Bolt Locations for One-Way
Ceiling Cassette Indoor Units.
Figure 99: Ceiling Opening / Hanging Bolt Locations for Two-Way
Ceiling Cassette Indoor Units.
General Mounting
APPLICATION GUIDELINES
Figure 100: Ceiling Opening / Hanging Bolt Locations for Four-Way Ceiling Cassette Indoor Units.
(Unit: Inch)
TU Frames: 38, TT Frames: 50-5/8
TU Frames: 41-15/16, TT Frames: 54-9/16
2
TU Frames: 33-7/8, TT Frames: 46-1/2
17-5/8
12-1/16
2
9-7/8
23-5/8
15-3/4
1-9/16
1-9/16
18-3/8
13-15/16
16-1/8 Hanging Bolt
23-5/8
25-1/4 Ceiling Opening
(Unit: Inch)
40-11/16 Ceiling Opening
33-11/16 Hanging Bolt
32-11/16
2-3/8
116(4-9/16)
4-9/16