7
2
TIPS FOR SAVING
ENERGY
3
IMPORTANT SAFETY
INSTRUCTIONS
8
INSTALLATION
PROCESS
9
OUTDOOR UNITS
INFORMATION
14
ENVIRONMENT-FRIENDLY
ALTERNATIVEREFRIGER-
ANT R410A
14
SELECT THE BEST
LOCATION
15
INSTALLATION SPACE
15
Individual Installation
17
LIFTING METHOD
18
INSTALLATION
18
The location of the Anchor bolts
19
Foundation for Installation
20
Preparation of Piping
23
Plumbing materials and storage methods
25
REFRIGERANT PIPING
INSTALLATION
25
Precautions on Pipe connection / Valve
operation
26
PIPE CONNECTIONS
BETWEEN INDOOR AND
OUTDOOR UNIT
26
Preparation Work
27
Pipe Drawing Out during Single / Series
connection
29
Refrigerant piping system
42
Refrigerant charging
43
Distribution Method
44
Branch pipe Fitting
48
Leak Test and Vacuum drying
50
Vacuum Mode
51
Thermal insulation of refrigerant piping
52
ELECTRICAL WIRING
52
Caution
54
Control box and connecting position of
wiring
55
Communication and Power Cables
56
Wiring of main power supply and
equipment capacity
57
Field Wiring
63
Checking the setting of outdoor units
64
Automatic Addressing
67
Group Number setting
68
Static pressure compensation mode
69
Night Low Noise Function
70
Setting the ODU address
71
Target pressure adjusting
72
Self-Diagnosis Function
83
CAUTION FOR
REFRIGERANT LEAK
83
Introduction
83
Checking procedure of limiting concen-
tration
85
INSTALLATION GUIDE
AT THE SEASIDE
TABLE OF CONTENTS
TABLE OF CONTENTS
ENGLISH
Summary of Contents for Multi V ABRUV100LTS4
Page 86: ...86 ENGLISH ...
Page 87: ......