![LG Multi V ABRUV100LTS4 Installation Manual Download Page 54](http://html.mh-extra.com/html/lg/multi-v-abruv100lts4/multi-v-abruv100lts4_installation-manual_1892773054.webp)
54
ELECTRICAL WIRING
ENGLISH
Control box and connecting position of wiring
- Remove all of the screws at front panel and remove the panel by pulling it forward.
- Connect communication cable between main and sub outdoor unit through the terminal block.
- Connect communication cables between outdoor unit and indoor units through the terminal
block.
- When the central control system is connected to the outdoor unit, a dedicated PCB must be
connected between them.
- When connecting communication cable between outdoor unit and indoor units with shielded
cable, connect the shield ground to the earth screw.
UX3
UX2
Front Panel
WARNING
The temperature sensor for outdoor air should not be exposed to direct sunlight.
- Provide an appropriate cover to intercept direct sunlight.
!
Main PCB
Noise Filter
External PCB
Take care of the phase
sequence of 3-phase 4-wire
power system
Summary of Contents for Multi V ABRUV100LTS4
Page 86: ...86 ENGLISH ...
Page 87: ......