4. Trouble Shooting
- 77 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Check Point
1. Check the power source.(220V ±15%)
2. Check the fan operation is right.
3. Check the current.
4. Check the install condition.
5. Check the CT Sensor Output signal
(27/30/40k - Check output the CT Sensor : DC 2.5±0.2V)
(48/56k - Check output pin 1.2 of the CT Sensor : 5V )
Vdc
< Input Power Source Check Point >
< Main PCB>
<CT Sensing Check Point>
<CT Sensing Check Point>
< Inverter PCB>
Summary of Contents for Multi-Inverter Type
Page 123: ...P NO MFL36552501 APRIL 2008 ...