INSTALLATION
ENGLISH
23
6
Open two screws of control panel cover.
Screw
7
Connect one display connector and two
vane control connectors of front panel to
indoor unit PCB.
The position marking on PCB is as:
Display connector : CN-DISPLAY
Vane control connector: CN-VANE 1,2
8
Close the cover for control box.
9
Fit the link on the panel as shown in pic-
ture. (The link is included in the front panel
unit box.)
CN VANE 1,2
CN DISPLAY
Link
10
Attach the other side of link on the filter
guide of inlet grille. Install the air inlet
grille and filter on the panel.
Link
Filter
guide