28
Ceiling Concealed Duct Air Conditioner
Screw
Screw
Screw
Screw
Screw
Screw
Bracket
Bracket
(Space for PI485)
(Space for PI485)
Bracket
(Space for PI485)
AC line
DC line
CN_CENTRAL
CN_CENTRAL
CN_CENTRAL
WCN_P(N)
WCN_P(N)
WCN_P(L)
WCN_P(L)
WCN_P(N)
WCN_P(L)
PI485
PI485
PI485
PI485
PI485
PI485
Accessory Installation Guide
CN_PWR(AC)
Centroller
controller
connector(DC)
CN_OUT(DC)
PI485
Screw
Screw
Bracket
(Space for PI485)
CN_CENTRAL
WCN_P(N)
WCN_P(L)
PI485
PI485
PI485
• Fix PI485 to the bracket in the outdoor control box.(Figure 2)
• Connect PI485 to outdoor PCB and central controller with cable.(Figure 1,3)
- Connect CN-PWR to WCN_P(N) and WCN_P(L).
- Connect CN-OUT to CN_CENTRAL.
• Separate AC and DC line when connecting the cable to outdoor PCB.(Figure 3)
- Use the clip at the PCB case side.
• Tie the cables with the tie-wraps and clamps after intalling PI485.
• Refer to PI485 installation manual for detailed installation method
<Figure 1>
<Figure 2>
<Figure 3>
Summary of Contents for B42AWYN762
Page 35: ...P No MFL62541002 ...