How to Cope with Abnormal Test Run
Item
Phenomenon
Cause
Checkpoint and resolution
Check whether the heat source water supply pump is operating.
Check whether the heat source water supply pipe is clogged.
(Clean strainer, valve locked, valve issue, air trapped etc.)
Check whether the flow switch is normal condition.
(Flow switch problem, arbitrary control, disconnection etc.)
Check whether heat source water supply pump is operating.
Check whether the heat source water supply pipe is clogged.
(Clean strainer, valve locked, valve issue, air trapped etc.)
Whether
heat water
is supplied
Heat water not supplied or flow
rate is insufficient (During air con-
ditioning)
CH32
When connecting the flow switch,
heat-sourced water doesnʼt flow or
the amount of its flow lacks due to
the checked error related to heat-
sourced water.
CH24
Test Run
Precaution before test run
1
2
3
4
5
Check whether the air is completely removed and the water supply is flowing smoothly.
Check whether there is any refrigerant leakage of any disconnected or loose communication or power wire, or use
the electric wiring diagram to check the wiring connection condition.
Check whether the power and communication wire are connected.
Check whether the power cable L1, L2, L3 are correctly connected.
Check the insulation resistance with the DB mega tester device (DC 500V) between the power terminal block and
grounding, and check whether it is 2.0MΩ or above when measured.
If the resistance is 2.0MΩ or less, do not operate the product.
Precaution)
- Never check the insulation resistance for the terminal control board.
(The control board can be damaged.)
- If you leave the system turned off right after the installation or for a long period of time, the refrigerant gets accu-
mulated within the compressor and the insulation resistance reduces to less than 2 MΩ. When the insulation
resistance is 2 MΩ or less, turn on the power and let the electricity be supplied to the crank case heater of the
compressor and let the refrigerant including the oil inside the compressor to evaporate.
Then the insulation resistance value will increase to more than 2.0 MΩ.
Check whether the liquid and gas pipes are open.
Precaution when blocking the water cooling type Multi V main power
- While using the product (Air conditioning season/Heating season), always connect the main power of the outside
unit.
- During the test run operation after installing the product or during the operation after blocking the outside unit
main power (Power outage etc.), you must always connect the power 6 hours prior to heating the crank case
heater. If the crank case is not preheated for more than 6 hours with the electric heater, it can cause a burn on
the compressor.
(Heating the bottom part of the compressor with the crank case heater is to evaporate the refrigerant included in
the oil inside the compressor.)
• Always check whether the water supply is flowing smoothly before the test run. (If sufficient amount
of water is not flowing, it can burn the product.)
• During the initial test run after installing the product, leaving the product for more than 3 days or
after replacing the compressor, power must be connected 6 hours prior to the operation to heat the
compressor heater. (If the product is not heated sufficiently, it can burn the product.)