12
Outside Unit
Two Layer Installation
Space required for two layer installation as shown below considering passage for air and people.
: Service area
H-Beam Support
1,120(44-3/32)
100(5-7/8)
100
(5-7/8)
100(5-7/8)
<Front View>
[Unit: mm(inch)]
1,120(44-3/32)
100(5-7/8)
Installation space