REFRIGERANT PIPING CONNECTIONS
Indoor Unit Connections
Follow the steps below and refer to the illustrations on this page to connect piping to the Single Zone indoor unit. To see specific bundling of
piping and drain hose, see Section,
“Bundling and Cutting Line” on page 36. Also, refer back to “Drain Hose Guidelines”
section for proper drainage slope during piping procedure.
1. Open the front panel of the indoor unit (Figure 42).
2. Unscrew the three (3) screws at the bottom of the chassis cover.
3. Remove the chassis cover, being careful not to scratch the main
horizontal vane.
4. From the rear of the indoor unit, carefully bend the copper pipe
tubing holder away from the unit to expose for conduit bracket
installation area.
5. Remove the pipe port cover.
6. If conduit bracket has not been installed yet, follow Conduit
Bracket Placement section instructions on next page before going
to next step.
7. Position the bundled tubing by bending slowly downward first, as
• Bending the copper tubing directly left or right, without bending
downward first, may cause damage.
• Always secure the piping using the piping cover.
• Do not bend the pipes towards the front of the unit as this may
damage the unit.
Figure 43: Bending Pipe Tubing at Rear of Indoor Unit.
Unfold
slowly
downward
Bend from
downward position
Do not bend tubing
directly backwards
or to the sides
without bending
downward first!
This may cause
damage!
Piping to Indoor Unit
Figure 42: Removing Chassis Cover from Indoor Unit.
Chassis cover
Detach screws
Correct
Incorrect