General Information
Installation Manual
13
ENGLISH
Cycle Diagram
As is Air-to-Water heat pump, there are two different fluids cycling inside the system :
one is refrigerant, and the other is water. The refrigerant cycle and the water cycle are shown below.
AHBW036H0
Th7
: Heating
[Accumulator]
[Inv
. Comp]
High
Pressure
Sensor
EEV
Th5
Th4
Th6
Water Pump
Th8
Th9
Th2
Th3
<Water Side>
<Refrigerant Side>
<Inside of Monobloc Product>
[PHE]
EXP/Tank, E/Heater, Strainer, F/Switch are
not provided in product
❈
EXP / TANK
Under-floor
Heating
Radiator
City Water
Shower
W / TANK
3WAY V / V_1
Unit
(Monobloc )
B / HT
<Field Installation>
Th11
Remote Room
Temperature Sensor
(accessory)
<LG Supply>
<Accessory>
Sanitary water tank
is installed.
(Sanitary water tank kit
is necessary)
<Basic Installation>
Field installation parts are not provided in product
Th12
Solar therm
al component
W/PUMP_2
3WAY V / V_2
Solar thermal system
Solar panel
Th13
Solar thermal system is connected.
(Solar thermal kit is necessary)
Strainer