Installation
64 Universal System Air Conditioner
Ceiling & Floor Type
1076
Suspension
bolt
Center-line for the
piping hole
265
1236
265
Install Plate
1)
2)
Side Plate
Inlet Grille
Inlet hanger
Hanger
screw
■
Before Installing, prepare Installation
Plates
• 'Installation Plates' are attached at the bottom of indoor
unit.
Detach them by removing each 3 screws on both
sides.
• Detach 'Side Plate (R,L)' by removing each 2 screws
on both sides.
• Pull the upper right and left side of 'Inlet Grille' to the
front, and it will stop at slightly tilted position.
• Unhook the 'Inlet hanger' from the 'Hanger screw' on
both left and right side.
• Detach the 'Inlet Grille' from the Indoor Unit.
1) Installation on the ceiling
• Measure and mark the position for the Suspension
bolts and the piping hole.
• Drill the hole for anchor nut on the ceiling.
Before securing the Installation Plates, select the
bent direction of the Installion Plate to the inside
or the outside according to the installation
circumstances.
Summary of Contents for ABNC186HLAA
Page 79: ...Electronic Control Device Service Manual 79 Ceiling Duct Type ...
Page 80: ...Electronic Control Device 80 Universal System Air Conditioner Ceiling Floor ...
Page 81: ...Schematic Diagram Service Manual 81 Ceiling Cassette Type Schematic Diagram ...
Page 83: ...Schematic Diagram Service Manual 83 Ceiling Duct Type BH BE Series ...
Page 84: ...Schematic Diagram 84 Universal System Air Conditioner Ceiling Floor RY 4WAY RY OUTFAN ...
Page 119: ...P No 3828A22009A Printed in Korea ...