6.1.1
Post-Installation Check List
1.
Visual check if the wiring matches with the installation manual.
(3.2 Cable connection)
2.
The power cable connector is connected.
3.
The Circuit Breaker is ON.
4.
The battery "ON" LED is ON.
5.
The inverter power is ON.
6.
The inverter has the latest firmware.
1)
7.
The inverter recognizes the battery.
2)
8.
The battery can operate after installation is correctly done.
8-1. The AC grid is connected.
8-2. The Meter is installed.
8-3. The government approval is complete.
9.
IF ANY OF #8 IS CHECKED AS "NO" OR THE INVERTER
NEEDS TO BE TURNED OFF,TURN OFF THE CIRCUIT BREAKER.
3)
6.1.2
Troubleshooting Guideline
If the battery LED is OFF
1.
Turn off the Circuit Breaker.
2.
Disconnect the power cable connector.
3.
Turn off the inverter. Verify there is no power at the battery connection.
4.
Unplug all the wires and reconnect. Re-check the wiring on the battery is done
correctly. Refer to the installation manual
(3.2 Cable connection).
5.
After connecting the power cable connector, Turn on the Circuit Breaker.
6.
Turn on the inverter. and check the battery LED.
7.
If the LED is still off, turn off the Circuit Breaker.
8.
Disconnect the power cable connector.