25
1
2
3
10. Power (wire AWG, Max length,
Pinning)
a) Connect the ground wire to
terminal 1.
b) Connect the negative line of the
power cable to terminal 2.
c) Connect the positive line of the
power cable to terminal 3.
※
For the specifications of the terminal
block, see section 3.2.1 Spring
1
2
3 4
5 6
11. Communication (wire AWG, Max
length, Pinning)
At first, connect the ground wire to
terminal 2. Then, make connections
to the other terminals one after
another except terminal 6. Leave
terminal 6 unconnected.
※
For the specifications of the terminal
block, see section 3.2.1 Spring
12. Connecting the battery pack to the
inverter
Refer to the installation instructions
for the inverter to connect the power
cable and communication cable to the
inverter.
Then, push the circuit breaker switch
up so that it is in the ON position.
Installation
Summary of Contents for RESU10H StorEdge
Page 1: ...INSTALLATION MANUAL 10H ...