FINAL INSPECTION 

 

 

 = OK 

 

 

 

N = NOT APPLICABLE 

 

 

WELDING/ADJUSTMENTS 

 

Gate is welded secure to vehicle (mounting plates are welded to chassis frame). 

 

Mounting plates are welded to cross bar tube. 

 

Extension is welded to vehicle (12-2” or 3” welds across floor and gussets welded inside and out). 

 

Corners and steps welded to vehicle. Steps are optional. 

 

Reinforcement braces for corners and steps welded to cross members. 

 

Battery box welded or bolted secure to cross members. 

 

All bolts are tightened and secure. 

 

ICC bumper bar tube installed (optional). 

 

Lock block welded on tension arm right side (for safety latch rod). 

 

ELECTRIC’S 

 

Check that battery holds downs are anchored securely 

 

Check battery(ies) for proper charge level.             PROPER CHARGE LEVEL: 

 

Check all wiring connections for tightness (batteries, switches, etc.) 

 

Inspect and check all circuit breakers/fuses. 

 

Charge line/power line (through cross members with rubber grommets if you prefer) 

 

Charge line/power line (clamped to bottom of cross members with loom clamps) 

 

Electric line from gate to power pack (through cross members with rubber grommets if you prefer) 

 

Electric line from gate to power pack (clamped to bottom of cross members with loom clamps). 

 

Check operation of toggle switches 

 

HYDRAULIC/GREASE 

 

Check reservoir for correct amount of fluid (platform should be open and down when checking) 

 

Verify pressure relief valve set at 2500 psi. 

 

Check hydraulic hoses, fittings, and cylinder for leaks. 

 

Grease safety latch rod. 

 

OPERATION OF GATE 

 

Open and close lift gate.  Observe for correct operation (platform folds and unfold properly) 

 

Raise lift gate.  (platform is level with floor of vehicle). 

 

Lowering lift gate (platform brackets and tip of platform rest on the ground). 

 

ICC bumper does not hit the ground when gate is all the way down with platform on the ground.  

 

PAINTING AND SAFETY STICKERS 

 Repaint 

where 

needed 

 

Check hydraulic cylinder rods for over spray 

 

Install all safety and operation stickers 

 

 
 
 
 
 
 

CUSTOMER: 

LOCATION: 

VEHICLE#: 

LIFT GATE MODEL#:

LIFT GATE SERIAL#: 

Summary of Contents for TSG Hide-A-Way

Page 1: ...nstallation Manual TSG Hide A Way Truck Side Gate 10335 Wayne Avenue Cincinnati OH 45215 Ph 513 891 6210 Toll Free 866 539 6261 Fax 513 891 4761 www leymanlift com sales leymanlift com LML00120 4 22 1...

Page 2: ...gate 4 General View Truck Mounting 5 Truck Prep before Mounting Gate 6 Mounting Gate to Truck side door 6 12 Mounting Plate Assembly Reference 9 Recommended Oils 13 TSG Wiring 14 Decal placement 15 Fi...

Page 3: ...ed and the cause of the noise should be pin pointed and corrected 10 Do not over load the maximum rated capacity is based on an evenly distributed load all over the platforms flat surface 11 Always lo...

Page 4: ...OPERATING OF THE LIFT GATE Before operating the lift read and understand this decal urgent warning decal and the Owner s Manual Do not stand behind the lift gate while unfolding or using the platform...

Page 5: ...5...

Page 6: ...erves as the up stop for the gate Step 2 MOUNTING GATE TO TRUCK SIDE DOOR 1 Unfold the secondary platform 2 Clamp the secondary platform to the lift truck approximately centered see illustration on pa...

Page 7: ...7 TSG SILL CUTOUT...

Page 8: ...position 8 Now tack weld the gussets and support plate to the mounting plate and trunion tube Welds must be strong enough to support the gate without a load on the platform 9 Locate a suitable spot to...

Page 9: ...800 613 Mounting plate 2 2 BP 800 284 Gusset 3 12 P11029 Bolt GR 8 1 2 13 x 2 1 2 4 12 P23511 Lock nut 1 2 5 24 P26004 Flat washer 1 2 6 2 S577 008 000 Support St Angle 2 1 2x2x3 8x8 7 4 AP 999 023 G...

Page 10: ...10 Index Req d Part Part Name Material Size 1 2 BP 800 288 Power unit bracket 2 2 AT 998 007 112 Shim plate 1 8 x 3 x 6 3 4 P11029 Bolt 1 2 13x2 1 2 4 4 P23511 Lock nut 1 2 5 8 P26004 Flat washer 1 2...

Page 11: ...instead of a flip ramp the fixed taper will be off the ground It should come within 1 of the ground when the platform is loaded TSG platforms are level ride 15 If the gate operation is correct finish...

Page 12: ...resting on brackets approximately 1 2 above cylinder Weld solid down both sides as shown 1 4 fillet weld Caution Ground arms before welding brackets 20 Trucks Run 4 gauge power line from 150 amp circ...

Page 13: ...ange Chevron RYKON ISO 15 15o F to 150o F Mobil DTE 11 15o F to 150o F Shell TELLUS T15 15o F to 150o F Level 2 Cold Conditions Manufacturer Type Temperature Range Chevron AVIATION A 50o F to 80o F Mo...

Page 14: ...tches located on opposite side from door hinges Switch keyways must face down Drill a 2 1 4 hole through the outside wall at desired locations to mount toggle switches Must use heat shrink tubing prov...

Page 15: ...EMENT Stand Clear Bottom of Platform P55198 2 Secure Latch P55202 Operation of Lift Gate P55307 Max Capacity Decal Urgent Warning P55199 Read and Understand P55203 Shut Off Power P55201 Extreme Shield...

Page 16: ...er grommets if you prefer Charge line power line clamped to bottom of cross members with loom clamps Electric line from gate to power pack through cross members with rubber grommets if you prefer Elec...

Page 17: ...rcuit breaker Platform will not lower 1 Battery is low 2 Bad ground or electrical connection 3 Lowering valve is bad 1 Recharge the batteries 2 Check for corrosion and tighten 3 Check the coil Platfor...

Page 18: ...________________________________________________________________ ______________________________________________________________________________ ________________________________________________________...

Reviews: