INSTALLATION
9
INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
• Verify that your window casing has a minimum depth of 1 ½” which allows for
a partially recessed headrail mount. If flush mount (fully recessed mount) is
desired, a minimum mounting depth of 2” is required.
• Position the inside-mount brackets at each end of the headrail.
• Using the notches in the headrail as a guide for bracket placement, mark the
locations of the bracket, making sure they are square and evenly placed from the
window. Only two screws are needed per bracket and they should be placed in
bracket holes diagonally from each other.
Corded Lift Control
INSIDE MOUNT (IM)
Bracket
Bracket
Summary of Contents for Corded Lift Control
Page 22: ......
Page 23: ...Persianas natural INSTALACI N MANEJO CUIDADO Control de elevaci n con cuerda...
Page 44: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011801 19 0050 032...
Page 64: ......
Page 84: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011802 19 0050 033...
Page 102: ......
Page 103: ...Control de elevaci n sin cuerda Persianas natural INSTALACI N MANEJO CUIDADO...
Page 120: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011800 19 0050 034...
Page 150: ......
Page 151: ...Sistema de funcionamiento motorizado con bater a Persianas natural INSTALACI N MANEJO CUIDADO...
Page 180: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011799 19 0050 035...