4 INSTALLATION
INSTRUCTIONS
4.6
Surface Mount Enclosure Installation
The Surface Mount Enclosure uses four drywall anchors and screws (included)
for mounting.
1.
Select a desired installation location following the guidelines of 4.3.1.
2.
Using the “enclosure base” as template mark the four mounting holes on the
wall (See Figure 4A)
3.
Remove “enclosure base” and insert the anchors into the drywall.
4.
Determine which enclosure base “knockout” to remove for CT and voltage
leads. (See Figure 4B)
5.
Make a 1-2 inch diameter hole in drywall to bring the CT and voltage leads
wires through.
6. Place the enclosure base on the wall inserting the wires through the knockout.
7. Mount the enclosure base to the wall with the four screws included.
8. Verify wiring per Sections 4.3.2 and 4.4
9.
After running the tests in Section 4.7, place the cover on the meter and attach
with the provided screws.
14
Figure 4A and 4B - Mounting Hole Locations
Figure 4A
Figure 4B
WEB
VERSION
Summary of Contents for 6P201-C02
Page 2: ...WEB VERSION ...
Page 23: ...WEB VERSION ...
Page 24: ... 2018 Leviton Mfg Co Inc DI 000 MMSMT 00B WEB VERSION ...