Fast commissioning / operating principle
Leuze electronic
MA 235
i
13
TNT
35/7-2
4
V
3.3.2
Connecting the power supply and the bus cable
Ideally, use the ready-made cables listed in chapter 14.5.3 to connect the gateway to the
power supply via the
PWR IN
connection.
The ready-made cables listed in chapter 14.6.4 are preferred for connecting the gateway
to the fieldbus via the
HOST / BUS IN
connection.
If applicable, use the
BUS OUT
connection if you would like to construct a network with
linear topology.
3.4
Starting the device
Apply the supply v18 … 30VDC (typ. +24VDC); the MA 235
i
starts up.
The PWR LED displays that it is ready for operation.
3.5
MA 235
i
on the CANopen
Install the EDS file corresponding to the MA 235
i
in your planning tool/the control.
Notice!
You can find the EDS file at:
The MA 235
i
is configured in the planning tool/control by means of the EDS file. The MA 235
i
is assigned an address in the planning tool, which then has to be set in the MA 235
i
via the
S1 and S2 address switches. Only if the addresses are the same between the MA 235
i
and
the control can communication be established.
After all parameters have been set in the planning tool/control, the download to the MA 235
i
takes place. The set parameters are now stored on the MA 235
i
.
Afterwards, all MA 235
i
parameters should be stored via upload in the control. This aids in
retaining the parameters during device exchanges, as they a re now also stored centrally in
the control.
The CANopen baud rate is defined for the entire network in the planning tool/control. The
baud rate is set on the MA 235
i
via the S3 baud rate selector switch.
Only if the baud rates are the same is communication with the MA 235
i
possible.
Detailed information can be found in chapter 12.