background image

PAGE 7 OF 9

STEP 10 

STEP 11 

Remove the two (2) Buttonhead Bolts & their associated 

hardware located on the edge of the GearCage carrier fl oor 

as shown.

Install one (1) Latch Keeper [

Q

] onto each open end 

of the GearCage Side Rail by threading one (1) M6 

x 40 Button Head Bolt [

H

] with one (1) M6 Washer 

[

S

] through Latch Keeper and into the existing Pin 

Nut located inside the GearCage carrier Side Rail. 

[Figure 12]

NOTE:

 The Latch Keepers [

Q

] much be placed so 

the “keyhole” of the Latch Keepers faces the interior 

of the assembly. 

TOOL(S):  3/16 ALLEN WRENCH & 1/2in SOCKET OR WRENCH

TOOL(S):  4mm ALLEN WRENCH & FLAT HEAD SCREWDRIVER

STEP 12 

Place the Ramp assembly Hinges [

K

] over 

the exposed bolt locations on the GearCage 

carrier from STEP 11. 

Secure the Ramp assembly to the carrier 

using  two (2) M8 x 70 Buttonhead Bolt 

[

R

], four (4) M8 Washer [

M

] and two (2) M8 

Nylock Nut [

N

] as shown [Figure 14].

[Figure 14]

Existing 

Hardware

Existing 

Hardware

[Figure 13]

[Figure 12]

Q

H

S

GearCage

Pin Nut

M

M

N

R

Summary of Contents for GearCage Ramp

Page 1: ...hnical Support Product Questions Contact Us at 877 464 2376 or 719 630 3800 Email SUPPORT LETSGOAERO COM Installation Safe Use Operation Highlights Copyright 2017 Lets Go Aero Inc All rights reserved...

Page 2: ...x 40 BUTTONHEAD BOLT M6 NYLOCK NUT HINGE M8 x 40 BUTTOHEAD BOLT M8 WASHER M8 NYLOCK NUT M6 x 16 BUTTONHEAD BOLT LATCH KEEPER M8 x 70 BUTTONHEAD BOLT M6 WASHER PARTS LIST FOR INFO VIDEOS ON GEARCAGE CA...

Page 3: ...Figure 4 Secure the Side Tubes B to the Cross Tubes A by threading one 1 M6 x 65 Button Head Bolt D with a M6 Flat Washer E through the Side Tubes and into each Pin Nut Figure 4 Lay the Transition Fl...

Page 4: ...Nylock Nuts J in the mounting holes located closest to the Transition Flap F as shown Secure one 1 Hinge K to the remaining mounting hole on the Floor Panel G using one 1 M8 x 40 Buttonhead Bolt L tw...

Page 5: ...PAGE 5 OF 9 STEP 6 STEP 7 TOOL S 4mm ALLEN WRENCH 10mm SOCKET or WRENCH 5mm ALLEN WRENCH 13mm SOCKET or WRENCH Figure 8 Figure 9 Install the final Floor Panel G using four 4 M6 x 40 ButtonHead Bolts H...

Page 6: ...LEN WRENCH 10mm SOCKET or WRENCH STEP 9 Remove the End Rail and associated hardware located on the passenger side of the carrier See your GearCage Manual for proper procedure Figure 11 NOTE The existi...

Page 7: ...r Side Rail Figure 12 NOTE The Latch Keepers Q much be placed so the keyhole of the Latch Keepers faces the interior of the assembly TOOL S 3 16 ALLEN WRENCH 1 2in SOCKET OR WRENCH TOOL S 4mm ALLEN WR...

Page 8: ...order to operate properly TO FOLD DOWN RAMP Simultaneously pull the Latch Pulls toward the center of the Ramp until each Latch Keeper releases Slowly lower the Ramp until it reaches the ground FOR FO...

Page 9: ...nly obligation shall be to replace such products or parts proved to be defective To register your product visit the Let s Go Aero website at www LetsGoAero com Be sure to follow these guidelines to pr...

Reviews: