Electric Power Generation
1
Installation and maintenance
1
5
8
76 en - 2020.01 /
a
TALA44
Low Voltage Alternators - 4 pole
- Replace the terminal box lid [48] and also
the earth continuity boit [29].
Threaded rad
/
(WARNING)
When dismantling the shields, you will
need to change the antifriction bearings,
the "O" ring seal, the preloading (wavy)
washer and adhesive paste.
• Accessing the main field and stator
Dismantling
Follow the procedure for dismantling the
bearings.
- Remove the coupling dise (single bearing
alternator) and insert a tube of the
corresponding diameter on the shaft end.
- Rest the rotor on one of its pales, then si ide
it out. Use the tube as a lever arm to assist
dismantling.
-After extraction of the rotor, be careful not
to damage the fan or dismantle it.
- Remove the revolving field coil (rotor) and
place on special V-shaped supports.
NOTE: If intervention is required on the
revolving
field
coil
(rewinding,
replacement of components), the rotor
assembly must be rebalanced.
Reassembling the revolving field coil
- Followthe dismantling procedure in reverse
order.
Take care not to knock the windings when
refitting the rotor in the stator.
- Refit the fan with its fixing bolts on the hub.
Follow the procedure for refitting the
bearings.
4. 7 - Installation and maintenance of
thePMG
The PMG reference is PMG 7.
See the PMG manual ref: 4211.
20
LEROY-SOMER '"