![Lenze g350-B Series Project Planning Download Page 57](http://html.mh-extra.com/html/lenze/g350-b-series/g350-b-series_project-planning_1882398057.webp)
Mounting/ installation
More data and information for the mechanical and electrical installation can be found here:
•
Standards and operating conditions
•
The associated documentation provided with the product contains detailed
information on technical data, mechanical mounting and electrical wiring/
cabling.
Mounting location
•
The mounting location and material must ensure a durable mechanical connection.
•
The mounting surfaces must be plane, torsionally rigid and free from vibrations.
•
In case of continuous vibrations or shocks use vibration dampers.
•
The reaction torque of the product must be braced. Bracing by means of a torque plate or
flange attachment are examples of suitable measures.
Measures for cooling during operation
•
If the cooling air is contaminated (fluff, dust, soot, grease, aggressive gases), take adequate
countermeasures.
•
Arrange for regular cleaning.
•
If required, implement a separate air guide.
Mounting/ installation
57