
Instructions about how to read a worksheet to cable controller-to-stack connections can be found
towards the back of this guide.
Step 4. Connect the power supplies for each disk shelf:
a. Connect the power cords first to the disk shelves, securing them in place with the power cord
retainer, and then connect the power cords to different power sources for resiliency.
b. Turn on the power supplies for each disk shelf and wait for the disk drives to spin up.
Step 5. Set the shelf IDs and complete system setup:
You must set shelf IDs so they are unique within the HA pair configuration, including the internal
disk shelf in a DM3000x, DM5000x, or DM7000x.
6
Installation and Cabling Guide for DM120S, DM240S, and DM600S
Summary of Contents for DM120S
Page 1: ...Installation and Cabling Guide for DM120S DM240S and DM600S Machine Types 7Y58 7Y59 and 7Y43 ...
Page 4: ...ii Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 32: ...28 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 38: ...34 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 46: ...42 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 50: ...46 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 58: ...54 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 60: ...56 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 62: ...58 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 68: ...64 Installation and Cabling Guide for DM120S DM240S and DM600S ...
Page 69: ......
Page 70: ......