Figure 39. Installing the upper C-channel
①
Have one person hold and align the C-channel between the upper rack EIA flanges.
②
Secure the front end of the C-channel to the front EIA flange with
one
M5 x 20 mm screw
through the left most hole in the channel.
③
Secure the rear end of the C-channel to the rear EIA flange with
two
M5 x 20 mm screws
through the right and left most holes in the bracket.
Do NOT
over-tighten the screws as the rack EIA flange could be deformed.
Step 5. Rotate the server 90 degree clockwise so that the right side is facing down.
34
ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide
Summary of Contents for 7D2C
Page 4: ...ii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 10: ...viii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 12: ...2 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 14: ...4 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 24: ...14 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 70: ...60 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 71: ......
Page 72: ...Part Number SP47A41857 Printed in China 1P P N SP47A41857 1PSP47A41857 ...