Figure 21. Installing the front mounting bracket to the EIA flange
Note:
Make sure the rail stays horizontal.
①
Open the front bracket and align the front end of the outer rail to the EIA flange.
②
Pull the outer rail into the EIA flange until the pins are inserted into the corresponding holes.
③
Close the front bracket to secure the rail.
Step 6. Repeat the previous two steps to install the left outer rail to the upper EIA flange.
Step 7. (Optional) If you need to ship the rack cabinet with the enclosures installed or place the rack
cabinet in a vibration-prone area, install two M6 screws into the mounting flanges between the two
rear pins on both sides.
Figure 22. Installing the rear screws
Step 8. Rotate the E1 enclosure clockwise so that the right side is facing down. Have one person hold on
the front side, while the other hold on the rear side.
22
ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide
Summary of Contents for 7D2C
Page 4: ...ii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 10: ...viii ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 12: ...2 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 14: ...4 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 24: ...14 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 70: ...60 ThinkSystem Micro DataCenter 6U 1200mm Deep Rack Cabinet User Guide ...
Page 71: ......
Page 72: ...Part Number SP47A41857 Printed in China 1P P N SP47A41857 1PSP47A41857 ...