9. Install the microprocessor.
10. Secure the retainer with the handle.
11. Route all the cables that you disconnected from the system board, and then reconnect the cables to the
system board.
Hardware removal and installation
103
Summary of Contents for 11A9000DGE
Page 1: ...M75s 1 Hardware Maintenance Manual ...
Page 6: ...iv M75s 1 Hardware Maintenance Manual ...
Page 13: ...Chapter 1 Important safety information 7 ...
Page 14: ... 18 kg 37 lb 32 kg 70 5 lb 55 kg 121 2 lb 1 2 8 M75s 1 Hardware Maintenance Manual ...
Page 17: ...Chapter 1 Important safety information 11 ...
Page 18: ...1 2 12 M75s 1 Hardware Maintenance Manual ...
Page 19: ...Chapter 1 Important safety information 13 ...
Page 25: ...Chapter 1 Important safety information 19 ...
Page 29: ...Chapter 1 Important safety information 23 ...
Page 38: ...32 M75s 1 Hardware Maintenance Manual ...
Page 46: ...40 M75s 1 Hardware Maintenance Manual ...
Page 117: ......
Page 118: ......