4 / 23
Commissioning
1. Full reagent bottles must be connected before commissioning and switching on. Attach the vacuum connection onto
the reagent bottle using the union nut. Please observe the correct allocation of the reagents A, B and C to the dosing
pumps:
TH2025 = DOSIClip 1 (left),
Cl2025A = DOSIClip 2, Cl2025B = DOSIClip 3,
Cl2025C = DOSIClip
4 (right).
2. Switch the unit 'on' and press the "STANDBY" key. In this mode, an analysis is prevented from being carried out
before a correct program has been entered which could possibly result in an error or alarm message.
3. Then bleed the dosing pump and the capillary by repeatedly pressing the "Manual" key on the dosing pump. Ensure
all air is removed from the tubing! (If necessary tighten up the connections.)
4. Program the unit as applicable to your requirements, e.g.:
- Mode of operation
- Displayed units
- Limit values
- Flush time / interval
For a description of programming see from page
17
onward.
5. Enter the correct fill status of the reagent bottles:
"M"
º
SERVICE I
º
INPUT REAGENTS
º
REAGENT TH FILLING
(100%)
"M"
º
SERVICE I
º
INPUT REAGENTS
º
REAGENT A FILLING
(100%)
"M"
º
SERVICE I
º
INPUT REAGENTS
º
REAGENT B FILLING
(100%)
"M"
º
SERVICE I
º
INPUT REAGENTS
º
REAGENT C
FILLING
(100%)
6. Then remove all air from the water supply side of the unit by manual flushing.
"M"
º
SERVICE
º
MANUAL OPERATION
º
FLUSH
(
"ENTER"
press repeatedly).
Continue flushing until no bubbles can be seen in either the measuring chamber or the filter housing.
7. Check all connections for tightness.
8. Carry out the first analysis by pressing the
"Manual"
key.
Installation (example):